# Induction Checklist Coverage Gap Review

Review a new-starter induction plan against the full checklist before day one.

## Scope
Preparation and review only. No account action or professional decision.

## Inputs
Induction checklist and the scheduled plan for the first week.

## Workflow
1. List the checklist items the induction should cover.
2. Match each item to a scheduled session.
3. Flag checklist items with no scheduled session.
4. Return the gap list without changing the plan.

## Output contract
item | required | scheduled | gap

## Fictional acceptance test
Fictional induction checklist has 8 required items and the first-week plan schedules 6 of them: 2 items have no session and stay flagged for the hiring manager.

## Review gates
Keep original values, source IDs and version dates. Unknown facts stay held. Use qualified review for hiring, legal and accounting conclusions. No send, share, sign-in, scheduling, ledger change or payment. Fictional contract review is not a live account compatibility test.

## Method source
https://www.cipd.org/en/knowledge/factsheets/induction-factsheet/

Checked October 19, 2026. Oct17 live AIS Search Console (sc-domain property, tej@groweasy.ai, Saturday audit): Oct 9-15 complete week 22 clicks, 937 impressions, 2.3% CTR, position 10.6, day-row verified. Top queries: Muse India 125i (3-month), Planable/Claude social agent 45i, marketing Copilot 37i, Planable/ChatGPT 24i, investor agents 19i, Copilot investment-committee 14i, cash flow forecasting 13i, campaign brief 12i. Google Trends verified Oct 17: muse glimmer/spark rising. Site impressions are query leads, not monthly volumes; exact topic volume is unmeasured.
