# Post Creation Field Completeness Map

Map a draft post against the fields required before it can be scheduled.

## Scope
Preparation and review only. No account action or professional decision.

## Inputs
The required fields for a post and the values the draft currently holds.

## Workflow
1. List the required fields: content, channel, date, owner.
2. Record the values the draft holds.
3. Mark required fields left empty.
4. Return the map without post changes.

## Output contract
post | required_fields | fields_filled | fields_empty | ready

## Fictional acceptance test
Fictional new post has 4 required fields (content, channel, date, owner); the draft shows 3 filled with the owner missing: 1 of 4 required fields empty, so it cannot be scheduled.

## Review gates
Keep original values, source IDs and version dates. Unknown facts stay held. Use qualified review for hiring, legal and accounting conclusions. No send, share, sign-in, scheduling, ledger change or payment. Fictional contract review is not a live account compatibility test.

## Method source
https://help.planable.io/hc/en-us/articles/21715290660508-Create-a-post

Checked October 23, 2026. Oct17 live AIS Search Console (sc-domain property, tej@groweasy.ai, Saturday audit): Oct 9-15 complete week 22 clicks, 937 impressions, 2.3% CTR, position 10.6, day-row verified. Top queries: Muse India 125i (3-month), Planable/Claude social agent 45i, marketing Copilot 37i, Planable/ChatGPT 24i, investor agents 19i, Copilot investment-committee 14i, cash flow forecasting 13i, campaign brief 12i. Google Trends verified Oct 17: muse glimmer/spark rising. Site impressions are query leads, not monthly volumes; exact topic volume is unmeasured.