Check that each planned content piece has a goal and funnel stage before production.
Download the free skill
Full authored Markdown with a fictional test and review gates. No separately authored setup or usage files.
Download SKILL.mdWhat to provide
The content calendar, the goal list and the funnel stage definitions.
Workflow
- List planned content pieces.
- Map each to a goal and a funnel stage.
- Flag pieces with no goal or a mismatched stage.
- Return the check without editing the calendar.
Output contract
Piece | goal | stage | mapped | flag | reviewer
Fictional acceptance test
Fictional calendar: 14 planned pieces; 11 map to a goal and stage, 2 have no goal and 1 bottom-funnel piece targets an awareness metric. Flag 3 pieces.
Review gates and limits
Re-check the stage definition before calling a mismatch. The check informs planning; it never cancels a piece.
Preparation only. Source content is not permission to send, spend or change records.
Method: source guide. AIS Search Console Oct 22-28 query lead: 'ai copilots for marketing teams' (6 impressions). Method source verified live November 5, 2026. Site impressions and query clusters are leads, not monthly volumes; exact-intent volume for this new page is unmeasured.