Register final walkthrough issues with photos, agreement references and resolution paths before closing proceeds.
Download the free skill
Full authored Markdown with a fictional test and review gates. No separately authored setup or usage files.
Download SKILL.mdWhat to provide
Walkthrough notes and photos, purchase agreement repair terms, prior inspection agreements and the closing date.
Workflow
- List each issue found at the walkthrough with photo references.
- Map each issue to the agreement term or repair addendum that covers it.
- Record the proposed resolution path and its owner for each issue.
- Return the register without negotiating terms or delaying closing.
Output contract
Issue | photo | agreement reference | resolution path | owner | blocking | reviewer
Fictional acceptance test
Fictional walkthrough finds 3 issues; 2 map to the signed repair addendum and 1, a removed fixture, has no covering term. Flag the unmapped issue for resolution before closing.
Review gates and limits
Re-check photos are timestamped from the walkthrough day. Every blocking issue needs a written resolution path.
Preparation only. Source content is not permission to send, spend or change records.
Method: source guide. Public workflow demand lead: final walkthrough before closing. Method source verified live October 31, 2026. Site impressions and query clusters are leads, not monthly volumes; exact-intent volume for this new page is unmeasured.