Confirm every repair agreed in the addendum is complete with receipts before closing proceeds.
Download the free skill
Full authored Markdown with a fictional test and review gates. No separately authored setup or usage files.
Download SKILL.mdWhat to provide
Repair addendum, contractor receipts and photos, walkthrough notes and the closing date.
Workflow
- List each repair item from the signed addendum.
- Match each to a receipt or invoice inside the agreed contractor scope.
- Confirm completion evidence predates the final walkthrough.
- Return the checklist without certifying repair quality.
Output contract
Repair item | addendum line | receipt | date completed | walkthrough confirmed | reviewer
Fictional acceptance test
Fictional addendum lists 4 repairs; 3 have receipts dated before the walkthrough and 1, the water heater strap, has no receipt. Flag the missing item only.
Review gates and limits
Re-check that receipts name the property or seller. This check records evidence; it does not certify workmanship.
Preparation only. Source content is not permission to send, spend or change records.
Method: source guide. Public workflow demand lead: agreed repairs before closing. Method source verified live November 1, 2026. Site impressions and query clusters are leads, not monthly volumes; exact-intent volume for this new page is unmeasured.