Check review cycle readiness so ratings have evidence and reviewers are assigned before launch.
Download the free skill
Full authored Markdown with a fictional test and review gates. No separately authored setup or usage files.
Download SKILL.mdWhat to provide
The review cycle plan, the reviewer assignments and the evidence collection status.
Workflow
- List employees in the cycle.
- Check each has an assigned reviewer and evidence collected.
- Flag missing assignments and empty evidence files.
- Return the check without launching the cycle.
Output contract
Employee | reviewer assigned | evidence items | ready | reviewer
Fictional acceptance test
Fictional cycle: 25 employees; 22 have assigned reviewers, 3 do not, and 4 of the 25 have zero evidence items collected. Flag 7 employees total.
Review gates and limits
Re-check evidence requirements per role before flagging empty files. Readiness gaps go to HR; the check never starts a review.
Preparation only. Source content is not permission to send, spend or change records.
Method: source guide. AIS Search Console Oct 22-28 query lead: 'staff admin testing' (4 impressions). Method source verified live November 5, 2026. Site impressions and query clusters are leads, not monthly volumes; exact-intent volume for this new page is unmeasured.