Note deals aging in each pipeline stage so stalled deals get attention before they go cold.
Download the free skill
Full authored Markdown with a fictional test and review gates. No separately authored setup or usage files.
Download SKILL.mdWhat to provide
The pipeline export, the stage history and the expected days per stage.
Workflow
- List open deals with days in current stage.
- Compare each against the expected stage duration.
- Flag deals aging past the threshold.
- Return the note without messaging reps.
Output contract
Deal | stage | days in stage | threshold | flag | reviewer
Fictional acceptance test
Fictional pipeline: 25 deals; 18 are within stage thresholds and 7 sit past 1.5 times the expected days, 3 of those with no activity in 14 days. Flag 7 deals.
Review gates and limits
Re-check procurement-hold notes before flagging. The note feeds pipeline reviews; it never assigns blame.
Preparation only. Source content is not permission to send, spend or change records.
Method: source guide. Public workflow demand lead: pipeline hygiene. Method source verified live November 8, 2026. Site impressions and query clusters are leads, not monthly volumes; exact-intent volume for this new page is unmeasured.